3  Vehicle Recovery

At the conclusion of the Pier Wall Inspection (PWI) operation, the vehicle should be piloted to the launch site and recovered. Following the standard Post Dive Operations is recommended.

Pier Wall Inspection (PWI) Standard Operating Procedures, Version: 1.00.00
Copyright © 2022, VideoRay LLC - The Global Leader in Micro-ROV Technology