2.1  Site Selection and Set Up

The first priority for the site selection and set up should be safety. Ensure that the area and selected location for the operator control console, operator seating, power source, tether deployment path and launch site are risk and hazard free.

If possible, set up the operator control console so that the operator is not looking into the sun or has the sun at his or her back. The operator should also wear dark clothing to prevent bright reflections in the monitor. A hat with a brim can reduce glare and the operator control console sunshade can be used to enhance the image quality compared to operating in direct sunlight.

Logistics supplies like pop-up tents for shelter from the sun or rain and amenities like drinking water are good to have on hand.

Special considerations may be needed if operating from a vessel. These may include:

  • Location of the operator control console and operator seating:
    • Stability, especially as anticipated sea state increases
    • If operating from a vessel, set up the operating console and tether deploy to avoid interfering with boat operations
    • Access to power
    • Tether deployment path (Be careful when routing through doors or windows to prevent pinching.)
  • Tether deployment:
    • Clear path to launch point
    • Safe from propeller or anchor line fouling

Tether handling from a vessel requires dedicated attention to the task and coordination with the vessel operator at all times.

Pier Wall Inspection (PWI) Standard Operating Procedures, Version: 1.00.00
Copyright © 2022, VideoRay LLC - The Global Leader in Micro-ROV Technology