Pier Wall Inspection (PWI)
Standard Operating Procedures, 1.00.00
Pier Wall Inspection Checklist
[
Print this checklist
]
1
Mission Planning
1.1
Obtain a Chart
Optional if you do not have or plan to use a chart.
1.2
Load the Chart
Optional if you do not have or plan to use a chart.
1.3
Set Up Video Overlay
1.4
Define Inspection Parameters
Distance from Pier: ~ 0.7 times the visibility
Pass (pass) spacing: ~ 1.3 times the visibility (provides 10% overlap with previous passes).
1.5
Set Waypoint Defaults
Heading: Fixed (perpendicular to the pier
Waypoint Z Value: typically 0.65 times the visibility
Depth/Altitude: Depth (starting depth 0.65 times the visibility
Speed: typically 0.5 m/s (1.5 ft/s)
1.6
Place Waypoints
Place a minimum of two waypoints.
1.7
Save the Mission Plan
2
On-site Operations
2.1
Site Selection and Set Up
2.1.1
Begin the Predive Checklist
2.1.2
Initialize the Recording
2.1.3
Launch the Vehicle
2.2
Open Mission Controls
Set the Waypoint Locks as desired.
Speed, Heading, Depth - Enabled
If not using a chart, place waypoints for the start and stop of inspection passes at this time
2.3
Start the Recording
2.4
Conduct the Inspection
Double check the settings.
2.4.1
Start the Mission
Right-click on the first waypoint and select Go to Waypoint.
2.4.2
Fine Tune Settings
Sonar Range
Vehicle Pitch
Camera Angle
Heading
Speed
Altitude
2.4.3
Monitor the Sensors
2.4.4
Evaluate for Objectives
Use the manual control features to inspect targets more closely.
2.4.4.1
Looking for an Object
2.4.4.2
Mapping an Area
2.4.5
Complete Additional Passes
Continue the Inspection adjusting the depth before each pass and rerunning the mission back and forth between the end waypoints.
3
Vehicle Recovery
3.1
Return to Launch Site
3.2
Stop the Recording
3.3
Save the Mission
3.4
Recover the Vehicle
4
Post Mission
4.1
Analyze the Data
4.2
Archive the Data
Document Path: Pier Wall Inspection (PWI) Standard Operating Procedures > Checklist