3  Vehicle Recovery

At the conclusion of the Pier Pilings Inspection (PPI) operation, the vehicle should be piloted to the launch site and recovered. Following the standard Post Dive Operations is recommended.

Pier Pilings Inspection (PPI) Standard Operating Procedures, Version: 1.00.00