PPI Overview
Vertical Passes
Circumferential Passes
Navigation Pattern.htm
PPI Step-by-Step
1 Mission Planning
1.1 Obtain a Chart
1.2 Load the Chart
1.3 Set Up Video Overlay
1.4 Define Inspection Parameters
1.5 Set Waypoint Defaults
1.6 Place Waypoints
1.7 Save the Mission Plan
2 On-site Operations
2.1 Site Selection and Set Up
2.1.1 Begin the Predive Checklist
2.1.2 Initialize the Recording
2.1.3 Launch the Vehicle
2.2 Navigate to the Entry Point
2.3 Start the Recording
2.4 Conduct the Inspection
2.4.1 Start the Inspection
2.4.2 Complete Additional Passes
2.4.3 Moce to the Next Piling
3 Vehicle Recovery
3.1 Return to Launch Site
3.2 Stop the Recording
3.3 Save the Mission
3.4 Recover the Vehicle
4 Post Mission
4.1 Analyze the Data
4.2 Archive the Data
Checklist
VideoRay Documentation Only
[
Educational Resources Library
]
[
Help us improve this document
]
[
Print this page
]
Pier Pilings Inspection Checklist
[
Print this checklist
]
1
Mission Planning
1.1
Obtain a Chart
Optional if you do not have or plan to use a chart.
1.2
Load the Chart
Optional if you do not have or plan to use a chart.
1.3
Set Up Video Overlay
1.4
Define Inspection Parameters
Distance from Pier: ~ 0.7 times the visibility
Pass (pass) spacing: ~ 1.3 times the visibility (provides 10% overlap with previous passes).
1.5
Set Waypoint Defaults
Heading: Along Line
Waypoint Z Value: typically 0.65 times the visibility
Depth/Altitude: Depth (starting depth 0.65 times the visibility
Speed: typically 0.5 m/s (1.5 ft/s)
1.6
Place Waypoints
Place a minimum of two waypoints.
1.7
Save the Mission Plan
2
On-site Operations
2.1
Site Selection and Set Up
2.1.1
Begin the Predive Checklist
2.1.2
Initialize the Recording
2.1.3
Launch the Vehicle
2.2
Navigate to the Entry Point
2.3
Start the Recording
2.4
Conduct the Inspection
Double check the settings.
2.4.1
Start the Inspection
2.4.2
Complete Additional Passes
2.4.3
Moce to the Next Piling
3
Vehicle Recovery
3.1
Return to Launch Site
3.2
Stop the Recording
3.3
Save the Mission
3.4
Recover the Vehicle
4
Post Mission
4.1
Analyze the Data
4.2
Archive the Data