Vertical Thruster Splitter Replacement Procedures

Time required for this step: Approximately 2 Minutes

Tools required for this step:

  • None

Parts involved in this step:

FB-008 Vertical Thruster Splitter

QuantityPart NumberPart Description
1FB-008Thruster Part Vertical Splitter

Steps

  1. Orient the vertical thrust splitter over the top of the ROV so that the center is higher than the sides and the upper hole is aligned with the termination block stud and the lower hole is aligned with the vertical thruster shaft.

  2. Place the vertical thrust splitter on the ROV over the termination block stud and vertical thruster shaft.

If the video above doesn't play in your browser, click this play icon to try an alternate method: , or click this manual reference icon to view an exploded view


VideoRay Documentation Only

[ Help us improve this document ]

[ Print this page ]

Pro 4 Maintenance Manual, Version: Advanced 2.00.00
Copyright © 2019, VideoRay LLC - The Global Leader in Micro-ROV Technology