Pier Pilings Inspection (PPI)
Pier Pilings Inspection (PPI), Pier Pilings Inspection (PPI) |
3.3 Save the Mission After the mission is completed the mission should be saved. This will ensure that all of the added Waypoints, Markers, MOB points and other data entered will be stored as part of the data set for the project. |
Document Path: Pier Pilings Inspection (PPI) Standard Operating Procedures > PPI Step-by-Step > 3 Vehicle Recovery > 3.3 Save the Mission