Pro 4
Maintenance Manual, Advanced 2.00.00 |
Vertical Thruster Kit Replacement OverviewSkill level recommended: Advanced Total time required: Approximately 56 Minutes Tools required:
The following components must be replaced:
|
Document Path: Pro 4 Maintenance Manual > Vertical Thruster Kit > Replacement Procedures