Pier Wall Inspection (PWI)
Pier Wall Inspection (PWI), Pier Wall Inspection (PWI)

 1.2  Load the Chart

After obtaining a chart and copying it to the operator control console, the chart can be loaded into Greensea Workspace. There are two ways the chart can be loaded. Both methods require that Greensea Workspace is running and the Map view is visible.

  1. Open a file manager window, browse to the folder with the chart and drag and drop the chart onto the Greensea Workspace map area.

  2. Select the Map Config tab -> Charts subtab. Click on the Import Chart button. Browse to the file location and select the desired chart.

After the chart is loaded, you can toggle the visibility (on | off), set the opacity (0 - 100%), and if multiple charts are loaded, change the layer order of the chart.

Document Path: Pier Wall Inspection (PWI) Standard Operating Procedures > Step-by-Step > 1 Mission Planning > 1.2 Load the Chart