Pier Wall Inspection (PWI)
Pier Wall Inspection (PWI), Pier Wall Inspection (PWI)

 1.1  Download or Create a Chart

A pier wall inspection is best planned and conducted using a chart.

If you are conducting a Pier Wall Inspection and do not have a chart or do not plan to use one, you can skip this and the next section about loading the chart and continue at step: 1.3 - Set Up the Video Overlay.

There are several programs and online services for obtaining charts for various locations around the world. Some are available for free and other sources charge fees. Alternatively, Google Earth and SAT2CHART can be used to create charts as needed at no cost. For more information about these options, see: Creating and Using Charts

SAT2CHART is a Microsoft Windows based program and a Windows computer is required in order to use SAT2CHART.

Once a chart is obtained, it will need to be copied to the operator control console. There is a charts folder in the home folder of the operator control console. When archiving the project, it is a good idea to copy any charts used for the project into the archive for that project.

The resolution and quality of charts will vary depending on the source and amount of area covered. If the planned inspection covers a large section of a pier and you want to maximize the resolution of the chart, you can create several charts to cover the area at higher resolution instead of one chart covering the entire area.

Document Path: Pier Wall Inspection (PWI) Standard Operating Procedures > Step-by-Step > 1 Mission Planning > 1.1 Obtain a Chart