![]() |
Pier Pilings Inspection (PPI)
Pier Pilings Inspection (PPI), Pier Pilings Inspection (PPI) |
1.2 Load the Chart After obtaining a chart and copying it to the operator control console, the chart can be loaded into Greensea Workspace. There are two ways the chart can be loaded. Both methods require that Greensea Workspace is running and the Map view is visible.
|
Document Path: Pier Pilings Inspection (PPI) Standard Operating Procedures > PPI Step-by-Step > 1 Mission Planning > 1.2 Load the Chart