Pro 4
Maintenance Manual, Advanced 2.00.00 |
Vertical Thruster Motor Mount Removal OverviewSkill level recommended: Advanced Total time required: Approximately 59 Minutes Tools required:
The following components must be removed:
|
Document Path: Pro 4 Maintenance Manual > Vertical Motor Mount > Removal Procedures