Pro 4
Maintenance Manual, Advanced 2.00.00 |
Horizontal Thruster Drive Train Assembly Removal OverviewSkill level recommended: Intermediate Total time required: Approximately 12 Minutes (24 Minutes for both sides) Tools required: The following components must be removed: |
Document Path: Pro 4 Maintenance Manual > Horizontal Drive Train > Removal Procedures